D-12 Sample Migration Task Lists
Parallel Migration Task List Example Adaptive Server Enterprise 11.5
Front-End Phase 1 and 2 Regression Test Suite
1. Perform Phase 1 and 2 regression testing.
2. Monitor and capture system dynamics (
sp_who, sp_lock...).
3. Verify and document this SQL Server 10.x regression test.
Other Testing
Verify 11.5 performance and functions.
Run User Acceptance Tests on Adaptive Server 11.5 (Server B)
1. Production testers perform user regression testing of shadow
Release 11.5.
2. Monitor and capture system dynamics (
sp_who, sp_lock...).
3. Verify and document this Adaptive Server 11.5 regression test.
4. Determine if Release 11.5 is “go/no go”.
Shift Production Users to Adaptive Server 11.5 (Server B)
1. Ensure that there is no production activity.
2. Perform a Release 10.x dump from Server A (production).
3. Load the dump onto Server B (shadow).
4. Run
dbcc commands (checktable,checkalloc, checkcatalog) on the Release
10.x databases just loaded to Server B. Be sure to verify the
dbcc
log and error log
5. Switch the IP address, and rename the machines and servers.
6. Run user testing and verification.
Perform Final Steps
1. Enable replication (Server B to Server A).
2. Start production users on Release 11.5 (Server B).