Seagate ST3390N Przewodnik Instalacji Strona 233

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 232
Adding a node 14-3
Getting started
Standard 1.0 Modular Option EC Installation and Maintenance Guide November 1999
Getting started
Introduction
Before you continue with this section, read the “Hardware
modification” section in the System Installation and
Modification Guide (NTP 555-7001-215). It contains the full
list of steps involved as well as important preparation steps.
Node expansion
Node expansion consists of the following tasks. Each task
includes a reference to an earlier chapter, which provides more
detailed information if you require assistance in carrying out the
expansion.
Node expansion task list
Note 1: The procedures in this chapter refer to CEPS. Read this
as DCEPS for a DC system.
Note 2: If you are adding a module, leave the front and rear
doors off the new module, and remove the front and rear doors
from the existing modules. Remove the I/O cover from each
module.
Task Reference
Unpack and inspect the equipment. Chapter 4
If necessary, install Meridian Mail columns
and modules, including power and
grounding, and earthquake protection.
Chapter 5
Install the power supplies. Chapter 6
Install the disk drives and tape drive. Chapter 7
Configure the backplane and install
printed circuit packs (PCPs).
Chapter 8
Install intramodule and intermodule
cables.
Chapter 9
Install and configure peripheral devices. Chapter 10
Install the Meridian Mail to PBX interface. Chapter 11
Configure the Meridian 1. Chapter 12
Start up, configure, and acceptance test
Meridian Mail.
Chapter 13
Przeglądanie stron 232
1 2 ... 228 229 230 231 232 233 234 235 236 237 238 ... 467 468

Komentarze do niniejszej Instrukcji

Brak uwag