Assembly overview 3-3
Installation tasks
Standard 1.0 Modular Option EC Installation and Maintenance Guide November 1999
Installation tasks
Install task list
The following table shows the installation task list.
To see chapter
unpack and inspect the equipment 4
install Meridian Mail columns, including power and grounding, and
earthquake protection. Install Meridian Mail modules (if necessary)
5
install power supplies 6
install disk drives and the tape drive 7
configure the backplane and inspect printed circuit packs 8
install intramodule and intermodule cables 9
install, cable, and configure peripheral devices 10
install the Meridian Mail to PBX interface 11
configure the Meridian 1 12
start up, configure, and acceptance test Meridian Mail 13