Seagate ST3390N Przewodnik Instalacji Strona 251

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 250
Adding a node 14-21
One- to two-node expansion (shadowed)
Standard 1.0 Modular Option EC Installation and Maintenance Guide November 1999
One- to two-node expansion (shadowed)
Introduction
Node 2 is located at the right side of the same module as node 1.
See the illustration below.
Expanding from a 1-
node to a 2-node
shadowed system
To expand from a 1-node to a 2-node shadowed system, follow
these steps.
Step Action
1 Power down the module.
Note:
You must properly courtesy down the system before you
can power down. For more information on courtesy down
procedures, refer to the “System status and maintenance
chapter in the
System Administration Guide
appropriate to your
site.
2 Insert the additional CEPS, Enhanced MMP40 board (slot 7),
and disk drives (slots MSU4 and MSU5) into node 2 (Node Z)
as indicated in the illustration below.
Note:
Before you install the disk units, verify their jumper
settings. Refer to Chapter 12, “Configuring the Meridian 1.”
3 Remove the VP4 or VP8 cards from slots 0 to 3 as necessary,
and install them, along with the VPs supplied for expansion, as
follows:
a. Install 24 ports in slots 8 to 11.
b. Install a maximum of 24 ports in slots 0 to 3.
Note:
Fill up the voice card slots: start from the left in a given
node and begin with any VP8 cards designated for that node.
See the following illustration.
Adding node 2 to a shadowed system
0
VP/
GP
12345
Util
109
MSU1
MSU3 MSU5
CE
Power
Supply
Node
Y
Node X/Y Node ZMeridian Mail
Module
Node
X
CE
Power
Supply
6
MSU4MSU2
78 11
MMP
40
MMP
40
MMP
40
VP/
GP
G100067
Przeglądanie stron 250
1 2 ... 246 247 248 249 250 251 252 253 254 255 256 ... 467 468

Komentarze do niniejszej Instrukcji

Brak uwag